Yesterday:
Oilers drilled, tapped and installed, temporary clutch pedal iron wire replaced with 2mm brass wire and homebuilt adjustable fastener
[ Guests cannot view attachments ]
Today:
eccentric head bearing parts turned, drilled, tapped and installed on matching shortened shaft
[ Guests cannot view attachments ]
In the background my latest acquisition, a 8in tall 1910 J.FALK cast iron Band Saw ... never seen one before...