Finally finished this! This was no easy feat. For one, getting a fitting for 1/4-40 to 5/16-24 was an absolute nightmare but I made it work. The entire system has ZERO leaks. Tested it already. I will post a video of it in action later tonight or the day after this post in the comments section.
Boiler is a windowed boiler for easy sight of water levels. Gas fired, with insulation below the firebox. From there, PM research pipe runs from the Jensen boiler along the wood plinth to the engine and through the governor. Has two globe valves, one of which opens to the first set of steam line to warm it up and cut in and out for the whistle. Opening the second globe valve admits steam to the engine. At a nice idle speed it holds around 10-12psi depending on flame level.
With a load or accessory I can get it to hold out around 8-10psi. If I turn the throttle all the way up the governor will take control and slow the admission of steam to the engine. It’ll sit around 5-8 psi fully opened.
Boiler lasts around 10-15 minutes on one tank of water.
Engine has been fixed for all leaks and gaskets along with gland packing.
This was not an easy task getting the piping on here. Quite a puzzle. Attaching the last piece was tricky. Once all attached I then drilled into the plinth and mounted the entire assembly.
Let me know your thoughts [ Guests cannot view attachments ] [ Guests cannot view attachments ] [ Guests cannot view attachments ] [ Guests cannot view attachments ]