Hello Jim i have run it many times and it is a real joy...it all breaks down into small units for storage, it takes me about an hour to bring it all down and connect it up then generally get it ready for a run.
The plant was built on a budget by buying cheap sometimes non running engines, the beam and the No8.... the boiler also needed work....I then refurbished the whole lot to my best ability and made the plant as you see it ..i think it was well worth the effort....Steve
Absolutely worth the effort Steve, it just looks awesome. Love the transformation, just an all round top notch job.